Date: 2023-10-26. Time: 09:45:21. Subject: Containment breach of entity designation. Status: Neutralized. Primary objective: Secure the perimeter and contain it to prevent further spread.{ Additional protocols comprise immediate termination of personnel in zone Charlie, deployment of research team, and a full halt on all site access points. Further updates will be provided as available.
Incident Report: Site Ninety Six - SCP-XXXX Anomaly
On 07/14/2023 at circa 09:22 standard time, personnel at Site Ninety Six perceived an unusual anomaly related to SCP-XXXX. The occurrence involved sudden changes in the adjacent environment, presenting as shifts in pressure. Initial assessments suggest a potential breach in SCP-XXXX's containment, though further investigation is required to determine the specific nature and extent of the anomaly.
A team of experts has been deployed to Site Ninety Six to analyze the incident. All personnel have been instructed to exercise heightened awareness. The situation is more info currently under monitoring.
- Additional information will be relayed as it becomes available.
- Contact Dr. [REDACTED] for further inquiries.
Entry Required: Site-96 Restricted Archives
Personnel pursuing access to the restricted archives of Site-96 must maintain a valid security clearance of Level3. Only authorized personnel with relevant clearances will to infiltrate the secure archive facility. Improper distribution of critical information contained within is strictly prohibited. Any violation of security guidelines will result in termination and potential legal repercussions.
Exploration Log: Excavation at Site 96, Level Beta
Day seven, shift started at 0800 hours. Team Alpha concentrated on the excavation of a significant room in the eastern section. Preliminary findings suggest prehistoric structures. Team Beta continued their study of recovered materials, particularly a cluster of stones with unusual characteristics.
The current assumption is that these objects may be connected to a practice of the prior inhabitants of Site 96. Further analysis is required to confirm this possibility.
Atmospheric conditions remain favorable, though a slight elevation in ambient temperature was recorded later in the day.
Overall, progress at Site 96 continues to be positive.
Directive 09-Alpha: Site 96 Personnel Culling
All personnel at Site 96 are to be neutralized according to the outlined procedures in Annex A. The issuance of this directive signifies an imminent threat from within. All security protocols are to be implemented to their highest level. Personnel outside Site 96 must not infiltrate with the containment zone under any circumstances. This directive is final. Any resistance or noncompliance will be met with immediate and decisive action.
- Secondary protocols outlined in Annex A are to be followed precisely.
- All communication with Site 96 are to be severed.
- Auxiliary are to remain on standby for potential external emergencies only.
Facility Alpha Observation Report: Unusual Activity Detected
On Cycle 147 , at approximately 03:15 hours, a series of irregularities were detected at Site-96 . Multiple personnel reported auditory hallucinations . Security footage captured energy signatures, but further analysis is inconclusive. Additional personnel have been dispatched to the tertiary containment zone. A full report will be issued upon completion of the investigation.
- Addendum 1: Foundation protocol alpha-7 initiated./li
- Addendum 2: All personnel within a 1 kilometer radius of the anomaly are to remain on high alert./li
Comments on “Site Record: Site-96 Containment Breach Protocol”